Aug 27, 2011

Going Green with Six Sigma

The efficient approach to Going Green for any company is to follow the five phased DMAIC improvement process of Six Sigma.  Going Green can mean different things to different organizations.  You will have to define what Going Green means for your organization.

Defining your problems with waste...

Jul 22, 2011

Tracking Performance over Time

Tracking performance over time can be accomplished using either one of two methods which are Run Charts or Control Charts.  Both methods use time as the baseline and the performance measure as the measurement that is tracked over time.  The major differences in the methods relate to the measures...

Jul 17, 2011

Performance Measurement

Measuring performance is the key for driving dramatic improvements in any organization.  Choosing the right performance measures, or metrics, is essential to hone the focus of improvement project teams.

The key to honing the focus for the project team is to select measurements that are...

Jul 12, 2011

Control Strategy that Works

Maintaining the gains from operations improvements is challenging, but not insurmountable.  It all starts at the beginning of your improvement project before you have made any changes.  The following steps are a guide to make your improvements stick!

  • Before and After Measurements
      ...
Jun 16, 2011

Design of Experiments Process

The objectives for conducting a designed experiment are the following:

  • Find the most important factors/variables affecting a response(s).
  • Determine the best settings to improve the response(s) for the important factors.
  • Determine the cost effective settings for the factors that are...
Page 2 of 9 pages  <  1 2 3 4 >  Last »